Project: Crossway - project completed
Project Description
Integrated PVT system designed with biomass pellet boiler for top up heat, MVHR (Mechanical Ventilation and Heat Recovery) for capturing and distributing waste heat and Phase Change Material (PCM) thermal buffer storage to store heat.
Crossway is a Grand Designs project - officially Kent's first Zero-Carbon House.
SES PVT panels:
System size 27m2 2.95kW (electrical peak output)
Net System Outputs:
| Electrical | 2,873kWh/annum |
| Thermal | 9,627kWh/annum |
Thermal Buffer Storage:
400 litre solar tank + salt Phase Change Material (PCM) store.
Evo Aqua Pellet Boiler uses:
22kg of biomass pellets/annum
NED Air MVHR Unit:
32W fan power on normal setting with heat recovery efficiency 92%