Project: Chetwode Rd, Respite Centre - Installation completed

Chetwode PVT side elevation

Project description: Commercial Hybrid PVT installation

The largest Hybrid PVT installation in the UK to date and the first to use the new Vother PowerVolt panels. The installation has a combination of PowerTherm and PowerVolt, making this installation a world first by using both types of Hybrid collector.

The heat from the system is being used for the building with excess heat being vented through a 30kW fan assisted heat dump.

Panel Type: Hybrid PVT24 x PowerVolt 175/460 (unglazed)
24 x PowerTherm 155/680 (glazed)
Array size68.52m2
Peak Electrical7.92kW
Peak Thermal27.38kW
System Design Temperature60°C

Panel Outputs

Electrical9,216kWh/annum
Thermal19,801kWh/annum

Net Outputs

Electrical7,988kWh/annum
Thermal13,821kWh/annum